""  
Search:
 
 

| ENG
 

 ""

 ""
   

Press-center

News

2019-08-06
The shipment of large-sized equipment to JSC Gazpromneft-ONPZ was completed on August 6 at the berth of JSC Volgogradneftemash


Two reactors and a separator will be operated as part of the diesel hydrotreating / dewaxing unit of the Omsk Oil Refinery. The main vessel of the installation - the hydrotreating reactor and the dewaxing reactor - are made of high-tensile chrome-molybdenum-vanadium steel in accordance with the most stringent requirements of Russian standards and the international ASME standard. Their diameter is 3650 mm, length up to 44 meters, and the total weight is more than 500 tons. The mass of the third vessel, the high-pressure separator, is 184 tons. It is made of locally produced steels in accordance with the requirements of Russian standards and Technical Regulations of the Customs Union.

The equipment was sent to the customer by water. The route of its delivery from Volgograd to Omsk runs along the Northern Sea Route.